1801

Crinan Canal

Opened but not completely finished until 1809.

Croydon Canal

Dudley Clark

Started builing the 9.25 mile barge canal about this date.

Croydon Canal

John Rennie

While the canal Bill was going through parliament the Grand Surrey Canal Act was passed so the Croydon Canal was shortened to join it at New Cross. His estimate for inclined plane canal set out in the Bill was 50,847. 4,500 of this was for inclined planes at New Cross and Deptford and 6,200 for two steam engines for hauling boats up the planes.

Croydon Canal

Authorised by an Act.

Douglas Navigation

All of the traffic was lost to the Leeds & Liverpool Canal by 1801.

River Don

John Copeland

He made detailed surveys to support Jessop's proposals for improving the river.

River Don

William Jessop

He reported in February and more fully in the summer proposing new cuts and locks at Doncaster and Conisbrough as well as supporting earlier proposals for a cut with 2 locks at Eastwood.

Driffield Navigation

Improvements were authorised by an Act.

Exeter & Crediton Navigation

Authorised by an Act.

Ellesmere Canal

Thomas Denson

He was resident engineer for the canal.

Ellesmere Canal

William Jessop

He left the post of consultant engineer.

Ellesmere Canal

Chirk Aqueduct opened, 70 feet high.

River Foss

Promoted by Act.

Galton's Canal

Built by Mr E Galton in about 1801 for the carriage of silt for fertiliser.

Grand Surrey Canal

George Dodd

He gave evidence in favour of the Bill for the canal.

Grand Surrey Canal

Ralph Dodd

Was apointed engineer at 600 a year.

Grand Surrey Canal

Robert Dodd

Was appointed clerk of works.

Grand Union Paddington Branch

The Paddington Branch is opened.

General Warde's (Yspitty) Canal

Charles Smith

Sold his interests in this canal, together with his brother Henry, to Major-General Warde.

Kennet and Avon Canal

Promoted by a further Act.

Keyingham Navigable Drains project

Robert Stickney

The plan of his survey is deposited showinga new 1½ mile cut from the Humber to join the existing drain, which, apart from three shortening cuts, would then be used to the junction. The then existing Roos Bridge drain would then be utilised, but the drain to Owstwick would be extended by a short cut to the Roos-Burton Pidsea road.

Leeds and Liverpool Canal

Gannow tunnel was completed in early 1801.

Leeds & Liverpool - Leigh Branch

Samuel Fletcher

He estimated the cost of the branch with two locks at 29,826.

Leven Canal

James Creassy

The authorising Act required him to agree with William Jessop the width, depth and size of lock before work began.

Leven Canal

William Jessop

The authorising Act required him to agree with James Creassy the width, depth and size of lock before work began.

Leven Canal

John Rennie

Under the conditions of the authorising Act he was to act as arbitrator should a dispute arise between William Jessop and James Creassy on the dimensions of the canal.

Leven Canal

Authorised by an Act.

River Nene

William Jessop

The Deeping Fen Act was passed based on two reports, one of which he prepared with John Rennie.

River Nene

John Rennie

The Deeping Fen Act was passed based on two reports, one of which he prepared with William Jessop.

Pocklington Canal

Henry Eastburn

It was decided to employ him on a survey of two possible routes for the canal.

Peak Forest Canal

Benjamin Outram

He leaves his post as engineer.

River Stour (Kent)

Robert, junior Whitworth

About this time he was employed to survey a 100-ton ship canal to Canterbury. He proposed a line to St Nicholas Bay west of Margate. He said that the harbour at St Nicolas Bay would piling over the whole area.

River Welland

Edward Hare

The Deeping Fen Act was passed based on two reports, one of which he prepared with George Maxwell.

River Welland

George Maxwell

The Deeping Fen Act was passed based on two reports, one of which he prepared with Edward Hare.

River Welland

John Rennie

He together with William Jessop produced a report on the outfall.

Driffield Navigation

William Chapman

Appointed engineer.

Lancaster Canal

William Cartwright

Submitted a design for an aqueduct with three 120 foot spans as an alterative to a tramroad crossing of the Ribble.

River Don

William Chapman

Became engineering advisor to the landowners effected by extensions to the navigation and produced counter-proposals.

Leicester Navigation

Thomas Telford

About this date he was called in to see if the Loughborough to Nanpantan rail link could be replaced by a canal.

River Stour (Kent)

John Rennie

He approved Robert Whitworth's line and proposed an increase in the size of the canal to take 150-ton vessels, a dock area at the sea entrance and a side lock to the Stour. He estimated the cost at 86,000.

Salisbury & Southampton Canal

John Rennie

He wrote to the company 'When is Mr Jessop and myself to look for payment of our Bill for the arbitration business of the Salisbury and Southampton Canal - besides the Arbitration there is a considerable sum due to me for the former Surveys and Reports.

Sheffield Canal

William Jessop

In a letter to the River Don company he suggests that an extension to Sheffield could be included in the River Don Improvement Bill. On the basis of a quick survey he thought locks should be grouped at Tinsley as back pumping would be needed and the cost of maintaining a steam engine may be too much.

Lancaster Canal

Thomas Gibson

Around this date he produced a drawing for an aqueduct across the River Ribble with pointed arches, three of which spanned the river.

Lancaster Canal

William Jessop

He and John Rennie reported on the schemes for crossing the Ribble and recommeded a 640-feet long aqueduct 57 feet high with three 116-feet elliptical arches.

Lancaster Canal

John Rennie

He and William Jessop reported on the schemes for crossing the Ribble and recommeded a 640-feet long aqueduct 57 feet high with three 116-feet elliptical arches.

Lancaster Canal

William Cartwright

The committee record that Rennie and Jessop have approved his plans for a tramroad as a temporary crossing of the Ribble valley.

Huddersfield Narrow Canal

John Booth

Was assisting John Rooth in tunnelling at Standedge.

Huddersfield Narrow Canal

John Rooth

Was assisted by John Rooth in tunnelling at Standedge.

River Ancholme

John Rennie

He produced a report based on his survey recommending the building of catchwater drains and the widening and deepening of the river, construcing two new locks and reconstructing the road bridge at Brigg. He estimated the cost as 53,921 which included 6,063 of navigation improvements. These plans were later modified and re-estimated at 25,413.

Horncastle Canal

W Walker

At a meeting it was recommended that he (being one of the shareholders not present) "from his great knowledge of mathmatics and numberless other reasons is a very proper man to superintend the execution of the works necessary to complete the canal".

1802

River Ancholme

Promoted under Act.

Barnsley Canal

Opened to Barnby Bridge.

Caledonian Canal

Thomas Telford

After surveying the area around this time he recommended that public works should be carried out to "furnish employment for the industrious and valuable part of people in their own country" and advised the building of waterways and roads in the highlands and a canal through the Great Glen.

Caldon Branch - Trent and Mersey Canal

John Rennie

He was engineer for the third rail line between Froghall and the Caldon quarries. This was a four mile double line of plateway rising 649 feet through a combination of inclined planes and normal gradient track.

River Foss

William Scruton

He suggests that the cut along the line of the river above Strensall, planned by William Jessop, should be replaced by a straight cut from Strensall to Sheriff Hutton.

Glenkens Canal

John Rennie

He surveyed the route and estimated the cost as 33,382.

Glenkens Canal

Act passed but no work ever done.

Grand Surrey Canal

William Jessop

He reported on the state of the canal works following a dispute between Ralpph Dodd and John Rowe.

Grand Surrey Canal

Robert Dodd

Was dissmissed.

Grand Union Leicester Section

James Barnes

Surveyed a line from the Leicester Navigation to Norton with 16 locks and two tunnels.

Horncastle Canal

Opened.

Keyingham Navigable Drains project

An Act authorised navigation improvements subject to landowners approval but no work was done.

Kent & Sussex Junction Canal project

Francis John William Thomas Giles

Together with Netlam Giles he surveyed the route as part of John Rennie's check of Alexander Sutherland's work.

Kent & Sussex Junction Canal project

Netlam Giles

Together with Francis Giles he surveyed the route as part of John Rennie's check of Alexander Sutherland's work.

Kent & Sussex Junction Canal project

John Rennie

Netlam and Francis Giles he surveyed the route as part of his check of Alexander Sutherland's work. He confirmed Sutherland's main line and Lamberhurst branch and added another to Ashford and Wye. He estimated the cost at 175,653

Kent & Sussex Junction Canal project

Alexander Sutherland

His main line and Lamberhurst branch was confirmed by John Rennie.

Leicestershire & Northampton Union Canal

Thomas Telford

He was called in to report on James Barnes' proposals for a line to connect to the Grand Junction Canal. He agreed with the start and finish points but proposed a longer course to the east with less lockage. This was to go through Market Harborough, the upper Welland valley, Maidwell, Cottesbrooke, Hollowell, Ravensthorpe and Hodenby, with a branch to Rushton at a total cost of 228,207.

River Medway

Navigation was promoted by Act.

Monmouthshire Canal

David Davies

Surveyed the tramroad from Sirhowy worksto Newport.

River Nene

Charles Handley

The commissioners called on his services to prove that there was a sufficient water supply to enable the Northampton Arm to be built to connect the river to the Grand Junction Canal.

River Nene

John Snape

He, together with Charles Handley, was retained by the Western Division commisioners to prove that sufficient water supply could be found for the Grand Junction Canal Company to build a canal link to Northampton.

Oakham Canal

Completed.

River Ouse (Yorkshire)

William Pontey

He was consulted on the propsal to take a cut from above Strensall to Sheriff Hutton bridge. He approved the idea and was given charge of the work. The cut was open by about the end of June 1804.

Salisbury & Southampton Canal

Opened this year or 1803.

Sheffield & South Yorkshire Navigation

Stainforth & Keaby Canal opened.

Trent and Mersey Canal

Promoted by an Act.

Tavistock Canal

Hitchins

He and John Taylor did a survey for the tub-boat canal and estimated the cost as 40,000.

Tavistock Canal

John Taylor

He and Mr Hitchins did a survey for the tub-boat canal and estimated the cost as 40,000.

Woodeaves Canal

Built about 1802.

Barnsley Canal

William Jessop

He reported that the canal was complete.

Huddersfield Narrow Canal

John Woodhouse

He had made a bid for a contract to dig the middle section of the tunnel but withdrew when he got a contract on Blisworth Tunnel on the Grand Junction Canal.

River Witham Navigation

John Rennie

He was asked to advise on Kirkstead Lock which was in poor condition and had collapsed in a flood. He recommended removing the lock and rebuilding at a new site.

Beverley Beck

William Chapman

He designed Grovehill lock at the the point where the Beck meets the River Hull. As engineer to the Beverly & Barmstom Drainage he had built a tunnel under the Beck and had advised that a lock be built to maintain sufficient depth.

Rochdale Canal

William, Junior Crosley

Appointed engineer under William Jessop's supervision.

Rochdale Canal

Thomas Townshend

He left the company.

Brecknock & Abergavenny Canal

Thomas Cartwright

Did a survey to extend the canal from Gilwern to Llanfoist, having replaced Thomas Dadford as engineer for the canal.

Dorset & Somerset Canal

William Underhill

He was perhaps the "Underhill" who reported to the shareholder's meeting on the cost of completing the Frome branch and on the present and future supplies from local collieries.

Grand Surrey Canal

Ralph Dodd

He was given a gratuity and dismissed as engineer ostensibly because he was engaged on other work and was too expensive, although there is evidence that he did work without authorisation and had a disagreement with the chairman. He then attacked his replacement, John Rowe, and the canal committee but was still given some work by the company after this.

Grand Surrey Canal

John Rowe

About this date he was appointed engineer.

Neath Canal

Thomas Cartwright

Surveyed the line for a tramroad with James Birch.

Grand Junction Canal

John Woodhouse

He was one of several contractors engaged to build Blisworth Tunnel.

Sheffield Canal

William III Fairbank

Worked with William Dunn on surveying a line for the canal.

Sheffield Canal

William Dunn

He agrees to survey the line from Tinsley to Sheffield and proposes using 4 locks on the River Don then a canal with 5 locks from Brightside.

Pocklington Canal

William Chapman

Produced a report considering three lines for the canal of 8, 9.5 amd 13.5 miles in length and recommends the longest one.

River Witham Navigation

John Rennie

He started a three-day survey of the river and later recommended that either the navigable drains should be used to reach Boston below the Grand Sluice, or that the Grand Sluice should be by-passed by a new cut to the south.

1803

River Avon (Bristol)

Navigation Act.

Caledonian Canal

William Jessop

He was appointed consulting engineer for the project.

Caledonian Canal

Authorised by an Act.

Cottingham & Hull Canal project

Thomas Dyson

Was consulted about the estimate for the canal.

Dorset & Somerset Canal

Abandoned around 1803.

Fossdyke Canal

John Rennie

He proposed drainage and other works estimated at 12,260.

Leominster Canal

John Hodgkinson

He suggests tramroads as a cheaper alternative to canal cutting for connecting the canal to Kington and Stourport. An Act was passed in August to authorise the building of these tramroads.

London - Portsmouth Canal project

John Rennie

He put forward a canal route to rival William Jessop's proposal for a railway connection. The canal was to be 100 mile long with 41 locks and a 4,400 yard tunnel between Coulsdon and Merstham. From the Croydon Canal it was to run through Merstham, Crawley, Ifield, Horsham Common, Pulborough, Mundham, Chichester, Emsworth and Havant to Portsmouth. He also suggested branches to the Medway, Ouse, Adur and Arun. He estimates the cost without branches to be 720,649 for a broad canal and 571,621 for a narrow canal.

River Severn

Promoted by Act.

Thames & Medway Canal

Ralph Walker

He surveyed the uncompleted canal and found that much more money was needed to complete the work. He also suggested a a line ¾ mile shorter than planned with cutting depths of up to 100 feet .

Tavistock Canal

John Taylor

Started work as engineer on the canal tunnel.

Tavistock Canal

Authorised by an Act.

Wisbech Canal

Thomas West

For some years he had given the company satisfactory service as engineer at very moderate fees so now he was given a gratuity of 5 guineas.

River Witham Navigation

John Rennie

He recommended the replacing of High Bridge with a bridge giving a clear waterway of 34 feet. The estimate for his proposals that included substantial drainage works was 58,400.

Neath Canal

Evan Hopkin

He was engineer for the 8 mile tramroad from the canal head at Pont Walby to Aber-nant. It was finished within two years.

River Don

William Jessop

A parliamentary Bill was introduced for improvements based on his 1801 report.

Caledonian Canal

Thomas Telford

Around this time he was appointed principal engineer at a daily rate of 3 guineas plus travelling expenses.

Salisbury & Southampton Canal

John Rennie

He estimated that 9,950 was needed to complete the canal and 2,000 to repair deterioration.

Swansea Canal

Edward Martin

He reported to the Swansea corporation on the advantages of extending the canal to Oystermouth to carry limestone from the Mumbles cliffs. He was then asked to do a survey and estimate and to consider the use of a tramroad.

1804

Aire & Calder Navigation - Wakefield Section

Elias Wright

He reported that better work was now being done more cheaply at the Lake Lock depot. There were 9 carpenters, 4 sawyers, 4 blacksmiths, a blockmaker with his boy and a sailmaker and an assistant. He wrote that "a better set of Workmen are not to be found in any Yard in the Kingdom, not only as to their ability in their Profession but also for their Industry, Sobriety and good Conduct".

Ashby de la Zouch Canal

Opened from Marston to Moria.

Birmingham Canal Navigations

James Watt

He became a member of the canal company committee and remained so for the rest of his life.

Barnsley Canal

Fully open.

Caledonian Canal

Authorised by an Act.

Dearne and Dove Canal

Completed.

River Derwent

Ralph Burton

Produced a plan of the river from the Rye junction to Yedingham Bridge "for an Intended Navigation".

Glamorganshire Canal

Richard Trevithick

His locomotive ran on the canal company's Penydarren Tramroad.

Kennet and Avon Canal

John Rennie

He estimated that 415,100 more was needed for construction.

Leeds and Liverpool Canal

James Fletcher

Appointed joint surveyor with his uncle Joseph Fletcher.

Leeds and Liverpool Canal

Joseph Fletcher

Appointed joint surveyor with his nephew James Fletcher.

Leven Canal

Completed around 1804.

Monmouthshire & Brecon Canal

The Brecknock and Abergavenny Canal was promoted by Act.

Mersey & Irwell Navigation

Charles McNiven

Around this time he was probably the engineer who built a 7.75 mile cut from the navigation at Latchford to the entrance lock into the Mersey at Runcorn.

Monmouthshire Canal

John Hodgkinson

He made plans to extend the canal by half a mile at Newport eliminating the Town Lock and the tunnel.

Peak Forest Canal

Marple Locks were opened.

River Parrett

Promoted by Act.

Rochdale Canal

Opened.

Royal Military Canal

George Jones

He is working on the canal.

Sheffield Canal

William Jessop

He was asked by the River Don company to report on the possibility of a railway instead of a canal on the route.

Swansea Canal

John Royle

As canal engineer he was instructed to make out 'the allotments and alterations of the Wharfs and communication with the Tramroad required by the Oystermouth Tramroad Act'.

Thames & Medway Canal

Ralph Dodd

He had probably ceased working on the canal by this date.

Thames & Medway Canal

Authorised by an Act.

Worcester and Birmingham Canal

Promoted by an Act.

Warwick & Birmingham Canal

Thomas Green

He was appointed engineer when Thomas Sheasby left due to ill-health.

Warwick & Birmingham Canal

Thomas, senior Sheasby

He left his post of engineer due to ill-health.

Rochdale Canal

Promoted by an Act.

Grand Junction Canal

Benjamin Bevan

Together with Henry Provis was asked to prepare fresh estimates for the Wolverton Aqueduct following the contractors' claims for extra payments.

Grand Junction Canal

Henry Provis

Together with Benjamin Bevan was asked to prepare fresh estimates for the Wolverton Aqueduct following the contractors' claims for extra payments.

Grand Junction Canal

Benjamin Bevan

Having supervised repair work on the Wendover Arm he now proposed a new reservoir for storing water from the summit. The new reservior at marsworth was built in 1806.

London - Portsmouth Canal project

John Rennie

The Bill for his planned canal was defeated.

Caledonian Canal

William Jessop

He estimated the cost of the canal as 474,500 excluding land purchase.

Grand Junction Canal

John Woodhouse

He was appointed superintendent of tunnel workmen under James Barnes.

Salisbury & Southampton Canal

George Jones

He issues a writ for the payment of his salary. No payment was made and sheriffs seived portions of the canal.

Caledonian Canal

William Jessop

He advised Thomas Telford to appoint two resident engineers or superintendents.

Caledonian Canal

Thomas Telford

On William Jessop's advice he appointed Matthew Davison and John Telford as resident engineers.

Rochdale Canal

Charles McNiven

He writes to the Liverpool corporation and points out that although the Rochdale Canal is not complete "timber & other goods" from Hull are arriving at Manchester through that route even "under the disadvantage of twelve miles of land carriage".

River Lee

John Rennie

Following a survey of the navigaion he made a report proposing two new cuts. The first was to avoid the mills and millstreams at Enfield, Tottenham and Lee Bridge. The second was to avoid the course from Old Ford to Bow Bridge. No actiion was taken on this.

Glasgow, Paisley & Johnstone Canal

John Rennie

He reported on the route estimating that a canal for vessels of 25 tons would cost 130,960 or 166,711 if 60-ton vessels were to be used.

Peak Forest Canal

Thomas Brown

The opening of Marple Locks, for which he was engineer. These were to replace the Marple tramroad.

Royal Military Canal

John Rennie

He is retained as consultant.

River Rother (Eastern)

John Rennie

He described the Scots Float sluice, used for access between the river and the Royal Millitary Canal, as being 'very inconvenient and illadapted to the present vessels which navigate the Rother'.

Ipswich & Stowmarket Navigation

James Austin

Appointed surveyor.

Dearne and Dove Canal

Robert, junior Whitworth

He, or his brother William, probably took over and completed the canal following their father's death in 1799.

Dearne and Dove Canal

William Whitworth

He, or his brother Robert, probably took over and completed the canal following their father's death in 1799.

1805

Aberdeenshire Canal

Was opened.

Ashton Canal

Promoted under Acts of Parliament

Brecknock & Abergavenny Canal

Thomas Cartwright

Made a survey for a tramroad between Brecon and Hay.

Caledonian Canal

William Jessop

He and Thomas Telford decided that a basin should be made for Corpach sea-lock and that the locks should be arranged as staircase flights to save expense.

Caledonian Canal

Thomas Telford

He and William Jessop decided that a basin should be made for Corpach sea-lock and that the locks should be arranged as staircase flights to save expense.

Crinan Canal

John Rennie

He recommended James Hollinsworth as resident engineer.

Driffield Navigation

Improvements completed.

Ellesmere Canal

Pontcysylite Aqueduct - 121 feet above the River Dee. Opened.

Gloucester & Sharpness Ship Canal

Ralph Walker

An Act was passed based on his proposal to extend the main line and then build a branch to Hock Crib. 80,000 in shares was needed to finance the work.

Gloucester & Sharpness Ship Canal

Promoted by Act.

Grand Junction Canal

Grand Junction opened a double track tramroad in October 1805 while the Northampton Branch was awaiting completion. Blisworth Tunnel was completed.

River Great Ouse

Promoted under Act.

Ipswich & Stowmarket Navigation

James Austin

Absconded from his post as surveyor and had a ten guineas reward placed on his head by the trustees of the navigation.

Isle of Dogs Canal

Completed.

Kennet and Avon Canal

Promoted by a further Act.

Leeds and Liverpool Canal

James Fletcher

Reported jointly with Joseph Fletcher on alternative links to the Manchester, Bolton and Bury Canal.

Leeds and Liverpool Canal

Joseph Fletcher

Reported jointly with James Fletcher on alternative links to the Manchester, Bolton and Bury Canal.

Leicestershire & Northampton Union Canal

A new Act was obtained.

Lancaster Canal

William Miller

He made two surveys for the continuation of the canal to Kendal, one through Hincaster with a 340-yard tunnel and the other a more direct route with a 670-yard tunnel at Rains Hall at the cost of 71,755 for the cheaper option. He also suggested a 13-mile tramroad with three inclined planes at a cost of 38,575.

River Lee

Promoted under Act.

Mersey & Irwell Navigation

John Nightingale

Was appointed as the first full manager-engineer of the company at 500 a year with house, horse-keep and expenses when away from home.

Manchester & Salford Junction Canal

John Nightingale

Was asked by the Mersey & Irwell company to estimate the cost of this link.

River Mersey

Act of Parliament enabled the collection of tolls.

Peak Forest Canal

Promoted under Acts of Parliament

Perth Canal projects

John Rennie

Gave guidance to Robert Frazer in drawing up his plan for the canal.

Somerset Coal Canal

Opened.

River Thames

William Jessop

He and John Rennie surveyed the river from Kew to Boulter's Lock and recommended contracting and deepening the channel or preferably the building of long cuts and 5 pound-locks.

River Thames

John Rennie

He and William Jessop surveyed the river from Kew to Boulter's Lock and recommended contracting and deepening the channel or preferably the building of long cuts and 5 pound-locks.

River Wye

William Jessop

He made a survey of the river and notice of a Bill for improvement of the navigation was made.

Grand Junction Canal

Opened.

Worcester and Birmingham Canal

Thomas Cartwright

Secured a contract to finish the canal from Hopwood wharf to the entrance of the cutting leading to Tardebigge Tunnel.

Leicestershire & Northampton Union Canal

Thomas Newbold

He was appointed to build the line to Market Harborough.

Barnsley Canal

Samuel Hartley

He was ordered to lay out the line for a 2.5 mile tramway to Silkstone but it was not to be built for several years due to lack of money.

Glasgow, Paisley & Johnstone Canal

Thomas Telford

He produced a report recommending a 32 mile canal from Tradeston to a new harbour to be built at Eglinton on Ardrossen Bay with a branch to Salcoats. There was to be an 18 mile summit and the total estimated cost was 134,500.

Royal Military Canal

John Rennie

He wrote 'In respect to the contractors, I am sorry to say they have greatly disappointed my expectations, founded upon the diligence and accuracy with which I have seen other great Works done by them'.

Caledonian Canal

Thomas Telford

He told the commissioners that the eastern district of the canal employed about 500 workers, mainly from around the Moray Firth, and in the western district there were 404, including about 300 "strangers" from Appin, Arisaig, Kintyre, Lismore, Morrar and Skye also some crofters who had stettled on Corpach Moss after being evicted by Cameron of Lochiel from their farms on Loch Arkaig.

Grand Junction Canal

Benjamin Bevan

Reported on the construction costs and extra time spent locking through Berkhamsted Locks 58 and 59, which had experimental side ponds.

Somerset Coal Canal

William Bennet

Completion of the Combe Hay flight of locks, for which he was probably engineer.

Monmouthshire Canal

John Hodgkinson

The Sirhowy tramroad which he built was opened around this date.

Glasgow, Paisley & Johnstone Canal

Thomas Telford

A meeting in Paisley approved his plan and decided to apply for an Act of parliament.

Grand Junction Canal

John Woodhouse

He was appointed engineer of the Northern district.

Chelmer & Blackwater Navigation

John Rennie

Following complaints of water loss from millers at Moulsham, Barnes, Sandford, Little Baddow, Paper and Hoe he did a survey and reccomended improvements costing 4,918.

1806

River Avon (Bristol)

Navigation Act.

Birmingham Canal Navigations

Promoted by Act.

Glasgow, Paisley & Johnstone Canal

Authorised by the Glasgow, Paisley & Ardrossan Canal Act.

River Ouse (Sussex)

Promoted by Act.

River Ribble

An act was passed for imprving the navigation of the river.

Rochdale Canal

Promoted by an Act.

Royal Military Canal

Completed from Shorencliffe to Winchelsea as a line of defence.

River Weaver

Thomas, junior Morris

He undertook to build the Weston canal for 38,000 but the Weaver trustees thought his proposals too vague and diffuse.

Royal Military Canal

Lt-Col Nicolay

Completed the canal construction.

Lancaster Canal

William Miller

Pumping of water from the Ribble started after he finished the tunnel between the canal and the river and other works. He had been assistant engineer for some years after 1794.

Mersey & Irwell Navigation

John Nightingale

He was ordered to have steamboats built for the company's Manchester to Runcorn passenger services.

1807

Aire and Calder Navigation and River Aire

Elias Wright

He told shareholders "On the Navigation of the general Line of the Rivers, I think I may be permitted to say, it improves every Year, and is at present better than at any former time".

River Adur

River was first improved by Act of Parliament.

Alford Canal project

Joseph Crow

Made a survey and estimated the construction costs at 33,308.

River Don

William Jessop

He was asked whether any of his 1801 proposals needed to be altered but it seems he confirmed his original report.

River Ivel

Benjamin Bevan

Surveyed the river from Biggleswade to Shefford and conluded that the navigation could be extended by the construction of seven nmore locks and other works totalling 8,000.

Lancaster Canal

Promoted by Act.

Oxford Canal

Promoted by Act.

Portsmouth, Southampton & London Junction Canal

Michael Walker

He resurveyed the route for a 35 mile barge canal from the Itchen at Winchester through Alresford, Alton and Farnham to either Aldershot on the Basingstoke Canal or Godalming on the Wey Navigation. The summit was to crossed either by a 7 mile railway or (as was later proposed) a two mile tunnel. The cost was estimated at 140,000 with a railway or 200,000 with a tunnel.

Rochdale Canal

Promoted by an Act.

Royal Military Canal

Promoted for navigation by an Act, but originally built as a defence against a Napoleonic Invasion.

River Weaver

Promoted by Act.

River Witham Navigation

John Rennie

He proposes the scrapping of Kirkstead and Barlings locks and the construction of a new lock near Washingborough church.

Lydney Canal

John Rennie

He produces a report for the Department of Woods & Forests into the development of transport in the area. He suggests a wet-dock or basin at Nass Point beyond Lydney, perhaps with a canal up to Lydney and a basin there.

Carlisle Canal

William Chapman

The Canal Committee meeting considered his report proposing a canal from the town to the sea. The cost was estimated at 40,000 pounds if it took vessels of up to 45 tons or between 55,000 and 65,000 pounds for craft up to 90 tons.

Aire & Calder Navigation - Wakefield Section

Elias Wright

He advised shareholders to oppose John Lee and Shepley Watson's proposal for using their new cut saying "to suffer any individual, or set of them, to have the Power over the Water, would be total Ruin of the Navigation".

River Weaver

John Johnson

He is given the task of building the Weston Canal. The Weaver trustees insisting that it should be built by their own engineer and accepting a 2,000 penalty if it is not completed in 27 months.

Carlisle Canal

William Chapman

He added an appendix to his report of 27th June proposing both a 90 - 100 ton canal for the Irish, Scottish and Liverpool trade, and a 50 ton line to the collieries near Maryport, saying "I see by the newspapers, that the Sea Vessel Canal from Carlisle appearsto be as warmly espoused as that to Maryport for Canal Boats".

Grand Junction Canal

Benjamin Bevan

Together with Henry Provis was asked to examine the contractor Thomas Harrison's claim for payments in the dispute over the Wolverton Aqueduct.

Grand Junction Canal

Henry Provis

Together with Benjamin Bevan was asked to examine the contractor Thomas Harrison's claim for payments in the dispute over the Wolverton Aqueduct.

1808

Aire & Calder Navigation - Wakefield Section

Elias Wright

He completed the building of the new Lake Lock.

River Avon (Bristol)

Navigation Act.

Calder and Hebble Navigation

William Jessop

He was consulted by the company concerning a dispute with Sir Thomas Pilkington over the building of new locks at Fall Ing.

Carlisle Canal

William Chapman

In making comments on Telford's proposals for the canal he suggests that a steam engine would be a cheaper way of supplying water to the canal than the Wigton branch unless the branch could be commercially justified and that the locks could be 65 by 16 feet with 6 feet over the cill rather than of Forth & Clyde dimensions. This would be big enough for the Mersey flats that were expected to be trading from Liverpool.

Ellesmere Canal

The navigable feeder from Trevor to the Dee at Llantisilo completed what is now the Llangollen Canal.

Grand Junction Canal

Richard Trevithick

One of his 4 horse-power steam engines was ordered for pumping out water during repairs.

Leicestershire & Northampton Union Canal

Thomas Telford

He and James Barnes were employed to do another survey for a connection to the Grand Junction Canal.

Old Grand Union Canal

Benjamin Bevan

Appointed engineer at a salary of 500 a year plus 200 a year expenses.

Old Grand Union Canal

Thomas Telford

He and James Barnes made the preliminary surveys for the line of the canal.

Old Grand Union Canal

John Woodhouse

About this time he, supported by a Leicester group, put forward a line for the canal with a tunnel.

River Ouse (Sussex)

William Smith

He was appionted engineer.

Oxford Canal

Promoted by Act.

Salisbury & Southampton Canal

Company defunct by 1808.

Worcester and Birmingham Canal

Promoted by an Act.

River Witham Navigation

Promoted by an Act.

River Ancholme

Samuel Porter

He was the navigation engineer.

Worcester and Birmingham Canal

John Woodhouse

The company agreed to trial an experimental boat lift that he had invented. Woodhouse was to errect this at his own cost and the company was to pay for excavation and masonry.

Grand Union Leicester Section

James Barnes

Surveyed a connection between the navigation and the Grand Junction Canal.

Cumberland Canal Project

Thomas Telford

He reported on the canal project adding that the 109,393 estimate could be reduced by 20,000 if the canal was built the same size as the Bridgewater or by 50,000 if it was a narrow canal. He said the canal could be extended to Eskdale and up the Eden valley as part of the route to Newcastle.

Worcester and Birmingham Canal

John Woodhouse

His 12 foot boat lift at Tardebigge was ready for trials. A wooden tank holding water and a narrowboat weighing 64 tons was counter balanced by a platform loaded with bricks, the two connected by eight chains running over cast-iron wheels.

Grand Junction Canal

Benjamin Bevan

He agreed to the suggestion that an iron aqueduct would be better than conventional brick to replace the colapsed structure at Wolverton and was asked, together with the company secretary, Charles Harvey, to make detailed investigations.

Thames & Medway Canal

Ralph Walker

He surveyed the canal again and recommended that much of the line proposed by the Act should be abandoned in favour of a route with a long tunnel further west which would "be attended with much advantage in point of saving considerable Expence, and upwards of one Mile and one quarter less in length".

1809

Aike Beck or Lockington Navigation

William Chapman

He reported to the drainage commissioners that the locks on the navigation had raised water levels and caused flooding.

River Avon (Bristol)

Navigation Act.

Brecknock & Abergavenny Canal

William, Junior Crosley

Engaged as engineer for 500 a year.

Brecknock & Abergavenny Canal

John Hodgkinson

He acted as consultant to William Crossley in the re-surveying of the line to connect the canal with the Monmouthshire Canal.

Crinan Canal

Completely finished.

Croydon Canal

Opened.

Grand Union Aylesbury Branch

GU Aylesbury Branch construction was started at the end of 1809.

Grand Union Market Harborough Branch

Completed to Market Harborough.

Kennet and Avon Canal

Promoted by a further Act.

Leicestershire & Northampton Union Canal

The canal reached Market Harborough.

Oakham Canal

Benjamin Bevan

Surveyed a line for extending the canal from Market Harborough to Stamford with a connection to Boston through the South Forty Foot Drain.

Oakham Canal

Hamilton H Fulton

He surveyed a line, under Thomas Telford's supervision, for the extension of the canal from Oakham to Stamford. There were also to be connections from the Welland near Market Deeping and to the Nene at Peterborough.

Oakham Canal

Thomas Telford

He supervised Hamilton Fulton in a survey of an extension of the canal to Stamford.

Salisbury & Southampton Canal

John Rennie

He wrote to the company clerk asking for his bill to be paid and was told that there were two plans for the future of the canal but it was difficult to get creditors together.The clerk ends the reply 'It is now running to ruin very fast'.

Sheffield & South Yorkshire Navigation

Promoted by an Act.

River Severn

Promoted by Act.

Stratford upon Avon Canal

Promoted by an Act.

Trent and Mersey Canal

Promoted by an Act.

River Thames

John Rennie

Following land owner's objections to the long cuts that he and William Jessop had proposed in 1805, he suggests nine pound locks instead.

River Wear

Promoted by an Act.

Portsmouth, Southampton & London Junction Canal

John Rennie

He estimated the cost of the canal with a tunnel at its summit would be 440,790.

Worcester and Birmingham Canal

Thomas Cartwright

He was paid for the work done under his contract.

Aberdare Canal

Thomas, junior Sheasby

He was engaged as resident engineer.

River Derwent

George, senior Leather

He is asked by S H Copperthwaite, agent of the Earl Fitzwilliam, to prepare plans to make the river navigable.

River Weaver

Samuel Fowls

Was appointed engineer.

River Avon (Bristol)

William Jessop

Water was diverted into the new cut from the floating harbour to the Avon so completing his 600,000 scheme for the docks at double his original estimate.

Grand Junction Canal

Benjamin Bevan

Advised on the prices and quality of stone for the peirs of the new Wolverton Aqueduct. He later recommended gornall stone from Cornwall for the piers before finding the equally good, but cheaper Hornton quarries stone in Warwickshire.

Worcester and Birmingham Canal

Thomas Cartwright

Due to ill health he left the post of engineer and was succeeded by John Woodhouse.

Worcester and Birmingham Canal

John Woodhouse

Appointed engineer in succession to Thomas Cartwright.

Grand Junction Canal

Benjamin Bevan

Lays the foundation stone for the new Wolverton Aqueduct.

Romford Canal

Ralph Walker

He signed a map entitled "Plan for Proposed Canal from Romford to the River Thames". This scheme was for a canal from Rainham Creek with an entrance lock and basin from the Thames connecting to the River Beam by a cutting. The route to Romford would then have followed the river valley.

Aberdare Canal

Edward Martin

He re-surveyed the line of the proposed canal.

Leicestershire & Northampton Union Canal

Thomas Newbold

His construction of the line to Market harborough was completed at the cost of 40,500 for the basin, buildings and 6¾ miles of canal.

River Weaver

Thomas Telford

He was called in to report on the works on the unfinished Weston Canal. In February 1810 he reported there "had been great want of judgement and method in executing the work".

1810

Aberdare Canal

Evan Hopkin

Together with David Hopkin he was the contractor on the canal.

Andover Canal to Basingstoke Canal project

Ralph Dodd

He advanced a scheme tfor a canal from Basingstoke to the Andover Canal by way of Overton, Whitchurch and the Test valley. This was opposed and soon dropped.

Annandale Canal project

Mr Jardine

He proposed the canal, which was reported to have an intended depth of 4.5 foot.

River Arun

John Rennie

He said 'the Arun is a very bad navigation, and barges navigating it experience great detention, from floods in winter and droughts in summer'.

Bristol & Taunton Canal

John Rennie

He surveyed the route and estimated the cost as 410,896.

Bristol Junction Canal project

William Whitworth

He did a preliminary survey for the route.

Central Junction Canal project

John Rennie

Was surveyed under his supervision.

English & Bristol Channels Ship Canal

W Bond

Together with J Dean he surveyed the line of the canal under Rennie's direction.

English & Bristol Channels Ship Canal

J Dean

Together with W Bond he surveyed the line of the canal under Rennie's direction.

English & Bristol Channels Ship Canal

John Rennie

W Bond and J Dean surveyed the line of the canal under his direction.

Gloucester & Sharpness Ship Canal

John Hodgkinson

He and William Jessop were asked to report on the canal and the proposd line to Hock Crib.

Gloucester & Sharpness Ship Canal

William Jessop

He and John Hodgkinson were asked to report on the canal and the proposd line to Hock Crib.

Grand Junction Canal

William, senior Thompson

Around this time he was appointed Northern District Engineer.

Previous PageNext Page

Chronology Index

 

Jim Shead Waterways Photographer & Writer
Text and photographs copyright of Jim Shead.
Home Introduction Waterways List Waterways Map Links Books DVD Articles Photo Gallery
Features Contact me Glossary Boats Events List History Local Waterways Help Photo List